East Messoyakhskoye field

East Messoyakhskoye field

Problem

The construction of four directional wells of the East Messoyakhskoye field, with a depth of 948 m, 3,334 m, 3,184 m and 2,599 m.

Obtained result

Casing strings were lowered into wells without landings.

Equipment used to solve the task
Used

N100, N100S

Centralizers have been long and successfully used in the well construction. It is recommended to use with an N11 stop collar.
Valves Fit-for-purpose Solution