East Messoyakhskoye field
Problem
The construction of four directional wells of the East Messoyakhskoye field, with a depth of 948 m, 3,334 m, 3,184 m and 2,599 m.
Obtained result
Casing strings were lowered into wells without landings.
Equipment used to solve the task
Used
Centralizers have been long and successfully used in the well construction. It is recommended to use with an N11 stop collar.