Construction of the exploration and appraisal well in the area under Khazri in terms of the offshore drilling

Construction of the exploration and appraisal well in the area under Khazri in terms of the offshore drilling

Problem

When constructing a prospecting and appraisal well in the water area of the Caspian Sea with a depth of 4202.9 meters, specialists of LUKOIL-Nizhnevolzhskneft needed a technical solution for guiding the liner 193.7 mm through the section with a small annulus in the cased borehole and subsequent centralization in the expanded open hole.

Solution

NORD specialists developed a new type of centralizer in a short time, taking into account technical requirements for non-standard conditions of the wellbore, technical tests were carried out and the necessary batch of centralizers Model N100SUr-194 was manufactured.

Obtained result

The rapid production, delivery to the mobilization point and further use of the centralizers Model N100SUr-194 and locking rings allowed to continue the construction of a prospecting and evaluation well on Hazri Square in the established time, to bring the liner 193.7 mm long 992.7 m to the bottom of 4202.9 m and to conduct high-quality cementing of the liner without complications.

Equipment used to solve the task
Valves Fit-for-purpose Solution